国产av日韩a∨亚洲av电影,国产乡下三级全黄三级bd,国产精品视频一区二区三区不卡,国产又大又猛又黄视频

NHI Headlines

NHI "Cooperation 2" Tunnel Boring Machine Starts Tunneling

Published:2016-07-06

On April8th morning, along with a "rumble" roar, NHI "Cooperation2" Tunnel Boring Machine (TBM for short) started tunneling at the 17m underground construction site ofCulture West Road Station of metro line 10. Compared with other TBM, this TBMmade by NHI is more humane with reasonable spatial distribution and its cutter parametersare more suitable for Shenyangsoil. "Cooperation 2" TBM complete the installation of 20 ringsegments within 24 hours. It is equivalent of tunneling 24 meters, by an averageof tunneling one meter per hour.